- Location: Seoul, Korea
- Function: Office facility
- Site area: 2,399㎡
- Building Area: 1,272.15㎡
- Gross Floor Area: 12,928.05㎡
- Building to Land Ratio: 59.75%
- Floor Area Ratio: 486.49%
- Bldg. area: 1,272㎡
- Total floor area: 12,928㎡
- Stories: B2, 10FL
- Structure: Reinforced concrete R.C
- Client: KICOX(Korea Industrial Complex Corp.)
- Project Team: Kwak, Dong-jin / Bae, Hyeong-sik / Choi, Seong-hwan
Shin, Gi-won / Jeon, Yeong-jae
- General Constractor: Contractor | Hwasung Industrial Co., LTD
- Structural Engineer: SUNJIN Engineering & Architecture
- HVAC Engineer: SUNJIN Engineering & Architecture
- Electrical Engineer: SUNJIN Engineering & Architecture
- Civil Engineer: Oju Engineering
- Design period: 2008   
- Construction period: 2010 
- Finish: Aluminium composite panel, Colored pair glass(ext.)
- Photographer: Lee Joog-hoon

site plan of High Clothing-technology Center
site plan of High Clothing-technology Center
The land is located at the center of Dongdaemun clothing trade area, a mecca for design and fashion industries, and it has a geometric shape with a width of 33 meters at maximum and a 6-meter difference of floor level at the highest. The main focus of its floor planning was on setting up an axis of planning considering the shape of the land and inducing the flows of pedestrian and vehicle traffic that adapt to the axis of the land.

Project High Clothing-technology Center In Korea Dongdaemun
High Clothing-technology Center In Korea - Office facility
Taking into account frequent shipment of commodities characteristic of companies settling in the center, business convenience was increased and overlap with the flow of pedestrian traffic was prevented by creating a separated unloading area and a parking lot. Support facilities intensively planned near the entrance are expected to secure recognition and enable efficient work performance by boosting the identity of the High Clothing-Technology Center. Moreover, rational use of space was realized through the organic connection of indoor facilities with outdoor facilities .
  • Design process :

Project High Clothing-technology Center In Korea Dongdaemun
Design process

Step 1. Mass formation
Step 1. Mass formation
Project High Clothing-technology Center In Korea Dongdaemun
Step 2. Segment
Project High Clothing-technology Center In Korea Dongdaemun
Step 3. Empty
North veiw
North veiw
South veiw
South veiw



  • Model :
Project High Clothing-technology Center In Korea Dongdaemun
Model-of-project
Project High Clothing-technology Center In Korea Dongdaemun
Model-of-project

Project High Clothing-technology Center In Korea Dongdaemun
Overall view
Dongdaemun High Clothing-Technology Center was pursued with the aim of revitalizing regional economy as general support facilities to lead the growth and development of fashion and design industries, and is focused on enhancing efficiency through the construction of direct shipment support system designed for the specialized objective of a fashion industrial complex.

Project High Clothing-technology Center In Korea Dongdaemun
front-view-elevation
Mass design was motivated by a skein that is used for clothing and monotony was evaded and openness was secured through the process of disconnection, filling and emptying. The elevation that harmonizes transparent glass with aluminum panels, added with point colors, brought into being vitality and vigor all around the building, and it goes well with Dongdaemun Design Plaza across the road.

View Exterior
View Exterior

Project High Clothing-technology Center In Korea Dongdaemun
ExteriorⅡ - night

Entrance
Entrance

Project High Clothing-technology Center In Korea Dongdaemun
Outside stairs - night

Project High Clothing-technology Center In Korea Dongdaemun
The roof gardenⅡ

Project High Clothing-technology Center In Korea Dongdaemun
The roof gardenⅠ

East elevation
East elevation

South elevation
South elevation

Longitudinal section Cross section
                         Longitudinal section                                                                                     Cross section

Stairs
Stairs

Corridor
Corridor

First floor plan
First floor plan


Third floor plan
Third floor plan

Fourth floor plan
Fourth floor plan


Fifth floor plan
Fifth floor plan

perspective of Project High Clothing-technology Center In Korea Dongdaemun
perspective of Project High Clothing-technology Center In Korea Dongdaemun 

Project High Clothing-technology Center In Korea Dongdaemun
project-High-Clothing-technology-Center

Interior
Interior

Details section of the project - Executive drawing
Details section of the project - Executive drawing


No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...

Total Pageviews

Popular posts