HEYDAR ALIYEV CENTER |
Project HEYDAR ALIYEV CENTER.
Architect Zaha Hadid Architects.
Design Zaha Hadid and Patrik Schumacher with Saffet Kaya Bekiroglu.
Project Architect Saffet Kaya Bekiroglu
Project Team Sara Sheikh Akbari, Shiqi Li, Phil Soo Kim, Marc Boles, Yelda Gin, Liat Muller, Deniz Manisali, Lillie Liu, Jose Lemos, Simone Fuchs, Jose Ramon Tramoyeres, Yu Du, Tahmina Parvin, Erhan Patat, Fadi Mansour, Jaime Bartolome, Josef Glas, Michael Grau, Deepti Zachariah, Ceyhun Baskin, Daniel Widrig, Special thanks to Charles Walker.
HEYDAR ALIYEV CENTER |
Main Contractor and Architect of Record DiA Holding
Consultants Tuncel Engineering, AKT (Structure), GMD Project (Mechanical), HB Engineering (Electrical), Werner Sobek (Façade), Etik Fire Consultancy (Fire), Mezzo Stüdyo (Acoustic), Enar Engineering (Geotechnical), Sigal (Infrastructure), MBLD (Lighting), Subcontractors and manufacturers, MERO (Steel Space Frame System) + Bilim Makina (Installation of Space Frame System), Doka (Formwork), Arabian Profile (External Cladding Panels / GRC & GRP), Lindner (Internal Skin Cladding), Sanset İkoor (Auditorium Wooden Cladding), Quinette (Auditorium Seats), Zumtobel (Lighting Fixtures), Baswa (Special Acoustic Ceilings) + Astas (Installation of Ceilings), Solarlux (Multipurpose Hall Façade Door), Bolidt (Polyurethane Floor Finish), Kone Elevators + Ikma (Installation of Elevators), MM Mühendisler Mermer (Marble Cladding Works), HRN Dizayn (Landscape LED Installation), Thyssen Group (Escalator), Remak Makina (Fire Doors and Concrete-Cladded Doors), Tema (Gypsum Panel Works), MIM Mühendislik (Structural Steel), Elekon Enerji Sistemleri (Main Building Lighting Control System), NIS Epoksi Kaplama Sistemleri (Epoxy Works), Light Projects Group (Lighting Fixtures), Limit Insaat (External Skin Insulations and Structure).
HEYDAR ALIYEV CENTER FACTS AND FIGURES
Zaha Hadid Architects Design HEYDAR ALIYEV CENTER |
HEYDAR ALIYEV CENTER FACTS AND FIGURES
Project name Heydar Aliyev Center
Location Baku, Azerbaijan
Client The Republic of Azerbaijan
Program Mixed-use cultural center
Procurement Design-build
Total floor area 101,801 m2
Site area 111,292 m2
Auditorium capacity 1,000
Unique fiberglass reinforced polyester panels 13,000 (40,000 m2)
Fiberglass reinforced concrete panels 3,150 (10,000 m2) GRC panels
Fiberglass reinforced polyester panel production Max 70 unique panels per day
Museum space frame 12,569 Members / 3,266 Nodes
Auditorium space frame 17,269 Members /4,513 Nodes
Total surface space frame area approx. 33,000 m2
Internal skin fixing plates 70,000
Surface area of inner skin Over 22,000 m2
Metal deck roof purlins at tender stage 3,607—total length 10,092m
Metal roof deck trays at tender stage 3,936—total area 26,853 m2 Roof area 39,000 m2
Location Baku, Azerbaijan
Start of project September 2007
Completion May 10, 2012Client The Republic of Azerbaijan
Program Mixed-use cultural center
Procurement Design-build
Total floor area 101,801 m2
Site area 111,292 m2
Auditorium capacity 1,000
Unique fiberglass reinforced polyester panels 13,000 (40,000 m2)
HEYDAR ALIYEV CENTER |
Fiberglass reinforced concrete panels 3,150 (10,000 m2) GRC panels
Fiberglass reinforced polyester panel production Max 70 unique panels per day
Museum space frame 12,569 Members / 3,266 Nodes
Auditorium space frame 17,269 Members /4,513 Nodes
Total surface space frame area approx. 33,000 m2
Internal skin fixing plates 70,000
Surface area of inner skin Over 22,000 m2
Metal deck roof purlins at tender stage 3,607—total length 10,092m
Metal roof deck trays at tender stage 3,936—total area 26,853 m2 Roof area 39,000 m2
Zaha Hadid Architects Design HEYDAR ALIYEV CENTER |
Zaha Hadid Architects Design Auditorium |
For more details about the project, click here
No comments:
Post a Comment